top of page

LabCheck U.K Ltd
Six Monthly Inspections
During a six monthly inspection we will conduct the following services:
-
Wash down inner cabinet and base
-
Remove and clean the baffle at the rear of the chamber
-
Check seal around drip cups, sink and wastes
-
Check cable connection to glass sash
-
Wash glass sash
-
Lubricate sash track runners
-
Lubricate cable support pulleys
-
Inspect the sash mechanism for corrosion and damage
-
Check internal light fittings
-
Check service valves
-
Inspect the fans, motors, drivers and bearings
-
Check average face velocity across the sash opening
-
Check function of audio visual alarm

bottom of page